1. Alfaro, M.C, Hayashi, S, Miura, N, and Watanabe, K (1995) Pull-out interaction mechanism of geogrid strip reinforcement.
Geosynthetics International, Vol. 2, No. 4, pp. 679-698.
2. An, D.W, Lee, D.S, Lee, D.H, Shin, C.Y, and Woo, I.J (2021) Steel pipe rebar mesh for earth retaining wall based on STG800 ground improvement steel pipe.
Journal of Korean Geotechnical Society, Vol. 37, No. 1, pp. 13-20.
3. Choi, J.P, Jin, H.M, Kim, C.M, Kim, S.S, and Choi, Y.G (2017) A study on the behavior of PHC-W retaining wall method based on the numerical analysis results.
Journal of Korean Geotechnical Society, Vol. 33, No. 2, pp. 5-15.
4. Do, J.U, Kim, H.S, Park, B.G, and Lee, J.H (2016) Evaluation on field applicability of cast-in-place pile using surfactant grout.
Journal of the Korean Society of Civil Engineers, Vol. 36, No. 1, pp. 75-83.
5. Gässler, G (1988) Soil nailing theoretical basis and practical design.
International Geotechniacl Symposium on Theory and Practice of Earth Reinforcement Balkema, pp. 283-288.
6. Han, J.G, Cho, Y.R, Kim, S.G, Park, S.C, and Eo, Y.W (2005) Case study on the design of earth retaining and retention wall using pre-casted concreted pile (PHC).
Journal of the Korea Society of Environmental Restoration Technology, Vol. 8, No. 3, pp. 33-42.
7. Han, J.G, Hong, G.W, Eo, Y.W, and Kim, S.G (2006) Case study on application of PHC pile to earth retaining and retention wall.
Journal of the Korean Geosyhthetics Society, Vol. 5, No. 3, pp. 37-44.
8. Jang, S.Y, Choi, J.S, Song, B.W, Choi, Y.Y, and Yoon, J.S (2012) Advanced C.I.P method to use the steel-casing with inner joint.
Journal of Korean Geo-Environmental Society, Vol. 13, No. 2, pp. 95-102.
9. Kim, C.M, Kim, S.S, Jeon, B.H, and Choi, Y.G (2017) A study on performance improvement of a PHC-W pile for PHC-W retaining wall.
Journal of the Korean Geotechnical Society, Vol. 33, No. 2, pp. 27-34.
10. Lee, G.G, and Park, Y.J (2021a) Construction technology for permanent retaining wall using PHC pile and steel pipe pile.
2021 Annual Conference Journal of Korean Society of Hazard Mitigation, pp. 356.
11. Lee, G.G, and Park, Y.J (2021b) Enhancing the self-supported capacity of permanent retaining wall using PHC pile.
2021 Annual Conference Journal of Korean Society of Hazard Mitigation, pp. 357.
12. Lee, J.H, Lee, K.I, Yu, N.J, and Kim, Y.S (2019) Evaluation of engineering properties of retaining wall material using fiber reinforcement.
Journal of the Korean Geosyhthetics Society, Vol. 18, No. 4, pp. 243-252.
13. Lee, K.K, Kim, D.H, Joo, E.H, Kim, Y.G, Kim, B.C, and Lee, J.H (2021) Flexural capacity evaluation of high-strength new-shape composite pile (S-Pile) for the soldier pile in the C.I.P method.
2021 Annual Conference Journal of Korea Institute of Building Construction, Vol. 21, No. 1, pp. 185-186.
14. Yoon, W.S (2019) Behavior of PHC pile connected by bolted rectangular steel tubular.
Journal of The Korean Society of Industry Convergence, Vol. 22, No. 6, pp. 615-626.
15. You, J.O, Shin, M.S, Yang, Y.H, Baek, S.K, and Sim, J.U (2005) Application of new excavation method using stabilizing piles.
2005 Annual Conference Journal of Korea Society of Civil Engineering, pp. 5315.